Weather Intelligence
Historical weather exposure · Proof of concept
CLOUDFLARE MVP · NASA POWER DATA
Weather screening, not a productivity or claims assessment

Was the weather different from what the contract anticipated?

Precipitation by period

Contract · historical weatherRevised · observed / projected weather
☁

Ready to compare

Choose a site and dates, then click Calculate to retrieve weather data.

Execution timeline ContractRevisedStriped = outside overlap
Timeline appears after loading.

Rainy shifts by period

Expand a period (+) to edit individual months
Operational shift controls will appear here after loading data.
● Contractual● Revised● Not scheduled✓ ScheduledFuture months use the frozen 10-year historical average.

Deviation = contractual historical rainy shifts − revised observed/projected rainy shifts, using only active shifts. Negative values indicate additional rainy-shift exposure; they are not proven productivity loss.

Baseline Weather Impact
—
MH · estimated rainy-shift exposure
Actual Weather Impact
—
MH · observed / projected exposure
Weather Impact Deviation
—
MH · baseline − revised
Import a workforce histogram to calculate exposure in MH (not verified productivity losses).

Monthly comparison

Baseline is fixed at contract signing; comparison period can move to subsequent years.

Planned month →
comparison month
Hist.
rain mm
Revised
rain mm
Rainfall
change
Hist.
rainy days
Revised
rainy days
Hist.
rainy nights
Revised
rainy nights
Dev. Rainy
Days
Dev. Rainy
Nights
Weather Impact
BL (MH)
Weather Impact
Actual (MH)
Weather Impact
Deviation (MH)
Weather
source
Click Calculate to request the server-side analysis.

Methodology and limitations. NASA POWER PRECTOTCORR provides hourly precipitation in mm/hour, which this MVP sums into day/night shift accumulations. Source values are gridded meteorological estimates, not site rain-gauge measurements. NASA's Local Solar Time is an approximation for defining work shifts; legal-time and daylight-saving corrections are not implemented. The monthly workforce histogram represents average employees per shift, not peak mobilization. Weather Impact (MH) = expected/observed rainy shifts × paid shift hours × average workforce, with disabled shifts temporarily excluded. This is potential exposure, not demonstrated lost productivity. For future months, revised rainfall is projected from the frozen pre-contract 10-year average. Current months combine available daily observations with a prorated historical estimate; missing observations remain identified. Pre-contract baseline uses the ten complete calendar years before the signature year. This is a screening prototype, not a claims determination. NASA API documentation.